Saturday, February 21, 2026

Manhattan Project 2.0 - Virtual Power Plant

 



Manhattan Project 2.0

Cyber-Physical Resilience & Data Integrity

The "Sensory Nerve" Strategy: Teleseer + Equitus KGNN

In a 150 MWh BESS fleet, the greatest threat isn't just a hack—it's Data Poisoning. If a 2 MWh container reports a false "Normal" temperature while actually overheating, the AI could trigger a thermal runaway. Teleseer prevents this by providing a "Hardware-Verified" truth.

  • PCAP Validation: Teleseer performs real-time Deep Packet Inspection (DPI) on Modbus TCP/IP and CAN bus traffic. It validates that sensor data (Amps, Temp, Voltage) matches the physical "fingerprint" of the reporting device.

  • Encrypted Traffic Inspection: Utilizing Cyberspatial's ability to analyze encrypted DER traffic, Teleseer ensures that commands sent to PID Controllers have not been intercepted or delayed (anti-latency protection).

  • The "Clean Data" Feed: Only packets verified by Teleseer are ingested by the Equitus KGNN. This creates a "Zero Trust" control loop where the AI never makes a thermodynamic decision based on unverified telemetry.

  • Automated Forensics: If an anomaly occurs, Teleseer provides an unalterable PCAP record. This allows engineers to "rewind the tape" to see if a PID instability was caused by mechanical wear or a cyber intrusion.


The Pitch Strategy: Winning Over the Utility/Data-center Stakeholders


1. For the Utility Trade Commission (UTC/PUC)


  • The Angle: "Grid Stability without Ratepayer Burden."

  • Key Argument: Emphasize that your AI-BESS system complies with CA SB 57 and DOE Section 403 (Manhattan Project 2.0).

  • The Value: By using Teleseer to prove the security of the co-located BESS, you reassure the UTC that these data centers won't crash the grid. Explain how the system acts as a "Virtual Power Plant" (VPP) that provides Ancillary Services (frequency regulation) back to the utility, lowering the "Cost of Interconnection" for everyone.




2. For Data Center Providers (Hyperscalers)

  • The Angle: "Speed to Power & 100% Uptime Guarantee."

  • Key Argument: AI data centers are facing 5–7 year utility upgrade delays.

  • The Value: Pitch the 2 MWh modular container as a "Behind-The-Meter" asset that allows them to scale now. Highlight that the Equitus/Graphixa (MaaP) layer handles the complex thermal balancing automatically, reducing the risk of expensive cell degradation and guaranteeing their Service Level Agreements (SLAs).



3. The "Sourcewell" Closing

  • The Pitch: "We are not just a technology; we are a pre-vetted procurement path."

  • Action: Point to your Sourcewell contract to show that federal and municipal data center projects can skip the 12-month RFP process and start construction immediately.

Would you like me to draft a specific "Statement of Work" (SOW) outline for a 150 MWh pilot project?

This video provides an excellent deep dive into how Teleseer visualizes network traffic and identifies passive vulnerabilities, which is critical for the "Cyber-Physical" layer of your BESS architecture. Passive Network Visibility using Teleseer












No comments:

Post a Comment

Sovereign Cyber-Physical Security

  " AIMLUX.ai Proposes -  By leveraging  Teleseer  for packet-level verification and  IBM Power11 MMA  for sovereign inference, TruVolt...